Skip to content

Window Film Drying Time

After installation, the window tint film may have a “hazy” appearance as well as a few water pockets. Don’t be alarmed. The film is going through a drying-out process known as curing. This is to be expected because the barrier nature of the film prevents you from removing 100% of the water/soap solution located underneath the film.

Complete dry-out should occur within a few weeks depending on the amount of sunlight, humidity and heat directed upon the window. Do not clean the film during this drying period. Once the film is dry, clean the surface with a lint-free cloth and a mild soap and water solution. Always avoid cleaning windows in direct sunlight.

Here’s the International Window Film Association window film curing times. 

Most vehicle window tint film thickness range is up to 4 mils.

Table 1:Typical Cure Times

Film thickness
in mils
Film thickness
in microns (µ)
Typical Cure
Time (days)
Up to 4
Up to 100
30
4 to 8
100 to 200
60
8 to 12
200 to 300
100

Visual Quality Standard for Applied Window Film as adopted by the International Window Film Association is as follows.

Installed film on flat glass surfaces is not expected to have the same level of visual quality as glass. The following criteria applies to the installed film only, and not to any defect inherent in the glass:

1) Installed film has a discrete time for full adhesion to occur. Installation utilises a detergent solution in the water to float the film onto the glass: the excess water is squeegeed out, but inevitably residual water will remain between the film and glass.
The time to achieve full adhesion is often referred to as “the adhesive cure time”. Adhesion increases from a lower value during this time. Visual and adhesive cure time depends on the thickness of the film and the various coating on the film. Typical visual cure times may be extended or shortened according to climatic conditions.

2) Inspection for optical quality is possible before full visual cure is attained. Table 1 above provides a guide for typical visual cure times. Please note that effects during cure, such as water bubbles, water distortion, and water haze are not to be regarded as defects.

3) The glass with applied film shall be viewed at right angles to the glass from the room side, at a distance of not less than 6 feet (2 meters). Viewing should be in natural daylight, not in direct sunlight, and shall assess the normal vision area with the exception of a (1-5 mm) band around the perimeter of the unit.

4) The installation shall be deemed acceptable if all of the following are unobtrusive (effects during visual cure should be disregarded): Dirt Particles, Hair and Fibres, Adhesive Gels, Fingerprints, Air Bubbles, Water Haze, Scores and Scratches, Film Distortion, Creases, Edge Lift, Nicks and Tears. Inspection may be made within 1 day of installation. Obtrusiveness of blemishes shall be judged by looking through the film installation, under lighting conditions described in 3.

5) The edge gaps (1-4 mm) around the perimeter shall be assessed by procedures similar to those in 3 and 4. A small number of particles are considered acceptable where poor frame conditions mitigates the high quality standards normally achieved.

6) Edge gaps will normally be (1-4 mm). This gap allows for the water used in the installation to be squeegeed out. This procedure ensures that film edges are not raised up by contact with the frame margin. Contact with the frame margin could lead to peeling of the film.

7) For thicker safety films, the edge gaps will normally be (1-4 mm), with (1-7 mm) being acceptable for films of 7 mil thickness. Combination solar control safety films also fall within this standard. An edge gap of up to (2 mm) is recommended, especially for darker (tinted, metallized, tinted/metallized, and sputtered) films, to minimise the light line around the edge of the installed film.

8) Splicing of films is necessary when larger panels of glass are treated, where both length and width of the glass exceed the maximum width of film. The splice line is not a defect. This line should be straight and should be parallel to one edge of the frame margin. The two pieces of film may be butt jointed. The maximum gap at any point in the splice line should be (1 mm). Film may be overlapped, spliced or butt jointed.

9) Certain films with special high performance coating may have lengthened cure times. 

Please consult the manufacturer for cure times of these films.

How to contact us with questions

If you have any general questions you can contact us at enquiries@dapaatints.co.uk

Last Modified 11/06/2020